That piece attaches to the supplied rail via the two holes that are counter sunk. (2 holes showing). The actual supplied rail is attached on barrel and gas tube using another supplied block.
the two longest supplied screws go through the bottom of the side rail block (pictured here) and squeeze/pinch this block to the side rail.
lynx 12 quad rail issues
in General Discussion - Any topic is welcome here!!!
Posted
That piece attaches to the supplied rail via the two holes that are counter sunk. (2 holes showing). The actual supplied rail is attached on barrel and gas tube using another supplied block.
the two longest supplied screws go through the bottom of the side rail block (pictured here) and squeeze/pinch this block to the side rail.